This blog was not supposed to be about home improvement, but we all go through phases.
The bathroom is done and we’re happy with it. In fact, I took two baths over the weekend!
Now, onto the kitchen.
IMG_20160215_173436075
The main reason for this work is that the dishwasher we had installed in the fall goes a few inches past the edge of the counter.
IMG_20160215_173415013
There’s insulation showing, and the house can never be sold or rented until that’s fixed. May as well get it done when Bob the contractor has the time.
insulation
So we’re going to get the counters replaced. We’ll extend it those few inches and use the end piece of wood from before the dishwasher to cover up that side.
IMG_1221
This will be the backsplash. Late update: Home Depot has to order more of it.
IMG_1219
The nook with the microwave is included.
IMG_20160221_101214813
We’re going to keep the sink, but get a new faucet.
IMG_1222
And change the knobs and handles on the perfectly fine cabinets to reflect the house’s long history and look more like the doors upstairs. (This part was obviously Garry and Bob’s decision!)
IMG_1223
That’s it for now. We were also thinking about redoing the floor.
IMG_1220
And maybe changing the fluorescent lights to LEDs. They would be brighter, eliminate the buzzing sound and lower the electric bill very slightly.