Site icon CohenConnect.com

Big bathroom remodel: Done with day 1

Big Bristol bathroom remodel: Done with day 1

Busy day at work, but also at home. The workers came bright and early, and gutted the place.

This is when they took their lunch break, courtesy Garry:

This is when they finished, courtesy Garry:

Who knew there was cement under the floor? They had to cut through eight inches of it with a jackhammer. Glad I missed that.

And this is what I came home to:

I’m sick. Sneezed all day. Came home early and feel ____y. I think you get it. We’re expecting somebody to pick this (stuff) up. The workers took the rest of the restroom refuse.

The victim in all this:

Poor Casey. He deserves much better. Ask him.

So one day of construction completed. More than a couple to go. Look for a likewise lowdown on the lavatory later. Can’t wait to see the 21st century from the seat.

Exit mobile version